Turkiye Installation Site

Turkiye Installation Site

Shencheng always insists on providing customers with high-quality services. We provide on-site product installation operation procedures for Turkish customers, which further improves customers' work efficiency and promotes friendly cooperation between both parties.
  • Descripton

Shencheng technicians provide on-site guidance to customers on the installation and operation of the tempering furnace, which further enhances our relationship with customers. At the same time, on-site guidance also allows customers to experience different services.

Installing a tempering furnace for glass involves a series of steps to ensure proper setup, safety, and functionality. 

Pre-Installation Planning:

Review manufacturer's specifications and guidelines for installation.

Conduct site assessment to ensure adequate space, ventilation, and utility connections.

Obtain necessary permits and approvals from local authorities.

Site Preparation:

Clear the installation area of any debris or obstructions.

Ensure the floor is level and capable of supporting the weight of the furnace.

Install appropriate ventilation systems to remove fumes and maintain safe working conditions.

Furnace Delivery and Unpacking:

Coordinate delivery of the furnace components.

Carefully unpack components, checking for any damage during transit.

Foundation Construction:

Construct a stable foundation per manufacturer's specifications, typically using reinforced concrete.

Ensure the foundation is level and provides sufficient support for the furnace.

Utilities Connection:

Coordinate with utility providers to connect electricity, gas (if applicable), and water supply to the furnace.

Ensure all connections meet safety standards and local building codes.

Furnace Assembly:

Follow manufacturer's instructions to assemble the furnace components, including heating elements, control panels, conveyor system, and safety features.

Securely attach components according to provided guidelines.

Safety Measures Installation:

Install emergency shut-off switches, fire suppression systems, and safety barriers as required by regulations.

Ensure all safety features are functional and accessible.

Testing and Calibration:

Conduct thorough testing of all furnace components to ensure proper functionality.

Calibrate temperature and conveyor speed settings based on glass specifications and desired tempering results.

Perform test runs to verify performance and make necessary adjustments.

Training:

Provide comprehensive training to operators on safe operation and maintenance procedures.

Emphasize proper handling of glass and adherence to safety protocols.

Documentation and Compliance:

Maintain detailed records of installation process, including equipment manuals, inspection reports, and permits.

Ensure compliance with all relevant safety regulations and industry standards.

Final Inspection and Approval:

Schedule a final inspection with regulatory authorities to verify compliance with safety standards.

Obtain necessary permits or certificates of compliance before commencing operation.

Ongoing Maintenance:

Develop a regular maintenance schedule to keep the furnace in optimal condition.

Perform routine inspections, cleaning, and lubrication of components.

Address any issues promptly to prevent downtime and ensure longevity of the furnace.

By following these steps diligently and working closely with experienced professionals, you can ensure a successful installation of a tempering furnace for glass.